![ec962f39-709e-4616-9d1d-8ed86f29506b](http://ijscontracting.co.uk/wp-content/uploads/2022/06/ec962f39-709e-4616-9d1d-8ed86f29506b.jpg)
.
![124925953_741738583352661_3580126279255230500_n](http://ijscontracting.co.uk/wp-content/uploads/2022/06/124925953_741738583352661_3580126279255230500_n.jpeg)
Every project starts somewhere once fully excavated the pool was shuttered and the concrete structure and filtration system installed.
![123966139_741738693352650_8650209032240472988_n](http://ijscontracting.co.uk/wp-content/uploads/2022/06/123966139_741738693352650_8650209032240472988_n.jpeg)
Concrete levels installed to provide the Plunge pool, Swimming areas and lower levels for the planting to allow the Pool to look after itself 12 months a year.